ConferenceYearTitleAuthorLocation
5th Intl CANDU Maintenance Conference2000SNN's Experience with the Baseline Inspection of Cernavoda Unit 1 Fuel Channels"I. Bucur (SNN), C. Talamazan, S. Azeez, H. Wong, B. Varandani (AECL)" unknown
5th Intl CANDU Maintenance Conference2000The AECL Fuel Channel Inspection System (AFCIS)"K. Chaplin, W. Mayo, J. Drossis, H. Licht, J. Schankula, D. Johnston (AECL)" unknown
5th Intl CANDU Maintenance Conference2000Towards Excellence in Human PerformanceP. Tremblay (OPG) unknown
5th Intl CANDU Maintenance Conference2000"Beyond Traditional Human Performance - ""Heart at Work""""V. Briant (CultureWorks, Inc.), W. Pilkington, R. White (NBP)" unknown
5th Intl CANDU Maintenance Conference2000Streamlined Reliability Centred Maintenance (RCM) - Application to CANDU 6 Stations"R. Richard, J. Nickerson, M. Holmes (AECL), L. DeLong (NBP)" unknown
5th Intl CANDU Maintenance Conference2000Darlington's Accelerated Approach on Equipment Strategies Development"I. Khan, R. Lalonde (OPG)" unknown
5th Intl CANDU Maintenance Conference2000Acoustic Fatigue of a Steam Dump Pipe System Excited by Valve Noise"S. Michaud, H. Pastorel (HQ), S. Ziada (MacU)" unknown
5th Intl CANDU Maintenance Conference2000Competitive Outage Lengths When Servicing the Liquid Relief Valves of the Heat Transport SystemC. Lorencez (OPG) unknown
5th Intl CANDU Maintenance Conference2000Reactor Building Integrity Test at Gentilly 2J. Routhier (HQ) unknown
5th Intl CANDU Maintenance Conference2000Integrated Maintenance Program at Cernavoda NPP - Unit 1"S. Marinescu, R. Urjan (Cernavoda NPP)" unknown
5th Intl CANDU Maintenance Conference2000The Role of Performance Assessment Groups in Bringing the OPG Maintenance to the World Class LevelK. Mika (OPG) unknown
5th Intl CANDU Maintenance Conference2000Maintenance Program for Power Conversion Equipment at Bruce 5-8"J. Santos, K. Mika (OPG)" unknown
5th Intl CANDU Maintenance Conference2000Review of Pickering 'A' As-Built Design Against Current Regulations and Standards"H. Johal, E. Tin (AECL)" unknown
5th Intl CANDU Maintenance Conference2000ECC Recovery Strainer Upgrade for the Pickering A Return to Service Project"K. Hau, T. Vu (AECL), G. Sham (OPG)" unknown
5th Intl CANDU Maintenance Conference2000Retrofit of New ECI Strainers in Pickering B"D. Rhodes (AECL), G. Makdessi (OPG)" unknown
5th Intl CANDU Maintenance Conference2000Gentilly 2 SG Primary Side Cleaning by SIVABLAST"A. Wolski (Siemens), N. Bains (AECL), S. Plante (HQ)" unknown
5th Intl CANDU Maintenance Conference2000Gentilly 2 Steam Generators Spring 2000 Outage: Tubesheet Waterlance Cleaning and Inspection; Upper Bundle Inspection"J. Akeroyd (Foster-Miller), S. Plante (HQ)" unknown
5th Intl CANDU Maintenance Conference2000Bruce B Unit 6 Divider Plate Sealing Skin InstallationL. Fortin (OPG) unknown
5th Intl CANDU Maintenance Conference2000Pressurizer Manway and Inspection Port Re-Engineering"D. Joudrey, J. Millman (BW), P. Ancker (OPG)" unknown
5th Intl CANDU Maintenance Conference2000When to Replace a Reactor Coolant Pump SealR. Metcalfe (AECL) unknown
5th Intl CANDU Maintenance Conference2000Reactor Coolant Pump Seal Response to Unvented Air"R. Metcalfe, D. Rhodes, H. Gentili (AECL)" unknown
5th Intl CANDU Maintenance Conference2000Hydro-Quebec Inspection Robot for PHTS Feeder Pipes Supports"J. Lessard, E. Lavoie, A. April, S. Beauregard, J. Cote, A. Drolet, P. Gauthier, D. Lapierre, R. Houde (HQ)" unknown
5th Intl CANDU Maintenance Conference2000Robotic Inspection of the Dump Tank Leg - An Accessibility Challenge"N. Bains, L. Eijsermans (AECL), W. Bek (OPG)" unknown
5th Intl CANDU Maintenance Conference2000Mitigation Strategies to Address Ageing in CANDU Heat Transport System Piping"A. Usmani, V. Murphy, D. Padhi (AECL), K. Verma, J. Slade (NBP)" unknown
5th Intl CANDU Maintenance Conference2000"Degradation of CANDU Fire Protection Systems: Past, Present and Future"P. Angell (AECL) unknown
5th Intl CANDU Maintenance Conference2000Minimizing the Risk of Feeder Environmental Cracking"M. Wright, T. Gendron (AECL)" unknown
5th Intl CANDU Maintenance Conference2000Electrosleeve Process for In-Situ Nuclear Steam Generator Repair"E. Renaud (BW), D. Stewart (Framatome Technologies), F. Gonzalez (Integran Technologies), A. Brennenstuhl (Kinetrics)" unknown
5th Intl CANDU Maintenance Conference2000Primary Divider Plate Replacement at Pickering NGS B"J. Cao, T. Griffith, G. Wangersky (BW), D. Zerkee (OPG)" unknown
5th Intl CANDU Maintenance Conference2000Primary Separator Replacement for Bruce Unit 8 Steam Generators"S. Roy (Canatom NPM), C. Mewdell (OPG), W. Schneider (BW)" unknown
5th Intl CANDU Maintenance Conference2000ChemAND - A System Health Monitor for Plant Chemistry"C. Turner, P. Balakrishnan, G. McKay, G. Mitchel, M. Thompson, G. Tosello (AECL), M. Bergeron, Y. Dundar, R. Laporte (HQ)" unknown
5th Intl CANDU Maintenance Conference2000Enhancing Fuel Handling System Surveillance Through Automated Log Monitoring"W. Ernst, D. Cosh (GEC)" unknown
5th Intl CANDU Maintenance Conference2000FLUS - Leak Detection on CANDU Secondary Side Piping: Experience at Pt. Lepreau and Gentilly 2"W. Knoblach, P. Jax (Siemens), G. MacDonald, K. Verma (NBP), S. Plante, P. Theoret (HQ)" unknown
5th Intl CANDU Maintenance Conference2000Ensuring MOV Reliability"J. Aikin, R. McCutcheon, I. Inglis, F. Guerout (AECL)" unknown
5th Intl CANDU Maintenance Conference2000Selection of Greases for Motor-Operated Valve Stem / Stem Nut Lubrication"F. Guerout (AECL), J. Janis (OPG), C. Jouve, J. Pitard-Bouet (EdF)" unknown
5th Intl CANDU Maintenance Conference2000Preventing Noise Caused by Vortex Shedding in Gate Valves and Orifices"B. Smith, B. Luloff, J. Tromp (AECL)" unknown
5th Intl CANDU Maintenance Conference2000"Nuclear Maintenance & ""Management 101"""J. Kappes (OPG) unknown
5th Intl CANDU Maintenance Conference2000The Effect of Privatization on Maintenance of a Nuclear Power Plant - Foreign ExperienceD. Burke (OPG) unknown
5th Intl CANDU Maintenance Conference2000COG - The New InitiativesP. Tighe (COG) unknown
5th Intl CANDU Maintenance Conference2000Identification of Organic Components and Commercial Grade Dedication Using Fourier Transform Near-Infrared SpectroscopyH. Azizian (NIR Technologies) unknown
5th Intl CANDU Maintenance Conference2000Environmental Qualification of Cabling for the Pickering 'A' Nuclear Power Plant Return to Service Program"J. Harber, T. Meyer, C. Gibb (AECL), M. Poirier (OPG)" unknown
5th Intl CANDU Maintenance Conference2000An Approach to Reducing Cost of an EQ Programme"K. Evans, H. Leung, D. Reichert (AECL)" unknown
5th Intl CANDU Maintenance Conference2000CANDU Plant Life Extension: Steam Generator Considerations"R. Tapping, J. Nickerson (AECL), K. Verma (NBP)" unknown
5th Intl CANDU Maintenance Conference2000Interfacial Materials for Nuclear Component Reliability and Plant Life Extension Initiatives"G. Palumbo, P. Lin, F. Gonzalez (Integran Technologies)" unknown
5th Intl CANDU Maintenance Conference2000Maximizing the Life of CANDU Pressure Tubes"H. Wong (AECL), P. Ellis (OPG), R. Baker (NBP), P. Gauthier (HQ)" unknown
5th Intl CANDU Maintenance Conference2000Pt. Lepreau Steam Generator Inspection"M. Addario (BW), K. Verma (NBP)" unknown
5th Intl CANDU Maintenance Conference2000X-Probe: An ECT Array as an Effective High-Speed Replacement of Rotating Probes"G. Lafontaine, F. Hardy, J. Renaud (R/D Tech Inc)" unknown
5th Intl CANDU Maintenance Conference2000Field Trial of a Fast Single-Pass Transmit-Receive Probe During Gentilly 2 Steam Generator Tube Inspection"L. Obrutsky, V. Cecco, R. Lakhan, S. Sullivan (AECL), M. Cantin (HQ), J. Renaud (R/D Tech Inc)" unknown
5th Intl CANDU Maintenance Conference2000Procedure Upgrade at PickeringJ. Noakes (OPG) unknown
5th Intl CANDU Maintenance Conference2000SIEL: Heavy Water Inventory System"P. Corbeil, M. Provencher (HQ)" unknown
5th Intl CANDU Maintenance Conference2000CATS (Contamination Control At Source) at PickeringA. Khan (OPG) unknown
5th Intl CANDU Maintenance Conference2000Strategic Provisioning of Replacement Parts for CANDU Power Plants"G. Mizuno, P. Tume, J. Prentice (AECL)" unknown
5th Intl CANDU Maintenance Conference2000Strategies for Replacement of Obsolete Equipment - Including Reverse EngineeringC. Irish (Nuclear Logistics) unknown
5th Intl CANDU Maintenance Conference2000Obsolescence In Nuclear IndustryU. Mondal (COG) unknown
5th Intl CANDU Maintenance Conference2000Hydro-Quebec METAR Inspection Bracelet"E. Lavoie, G. Rousseau, J. Lessard, A. Drolet (HQ)" unknown
5th Intl CANDU Maintenance Conference2000CANDU Heat Transport Maintenance and Life Management Program"D. Miller, G. Harvel, M. Soulard, R. Dam, V. Cecco (AECL)" unknown
5th Intl CANDU Maintenance Conference2000Initiatives to Reduce Feeder Wall Thinning"T. Gendron, R. Speranzini (AECL)" unknown
5th Intl CANDU Maintenance Conference2000The Use of 3D CAD Simulation for the Design and Implementation of Robotics and Remote Systems in the Nuclear Industry"N. Bains, B. Majarais, E. Woyrillowicz (AECL)" unknown
5th Intl CANDU Maintenance Conference2000Applicability of a Track-Based Multiprocess Portable Robot to Some Maintenance Tasks in CANDU Nuclear Plants"B. Hazel, J. Fihey, Y. Laroche (HQ)" unknown
5th Intl CANDU Maintenance Conference2000Advanced Pressure Tube Sampling Tools"K. Wittich, J. King (AECL)" unknown
5th Intl CANDU Maintenance Conference2000Fast Retubing of CANDU Reactors"D. Scott, J. Drossis, J. King (AECL)" unknown
5th Intl CANDU Maintenance Conference2000Plant Ageing Adjustments to Maintain Reactor Power at Point Lepreau Generating Station"W. Hartmann, M. Cormier (AECL), B. Willemsen, T. Whynot, P. Thompson (NBP)" unknown
5th Intl CANDU Maintenance Conference2000Contribution of SG Degradation Mechanisms to RIHT Behaviour"M. Yetisir, C. Turner, J. Pietralik (AECL)" unknown