| Conference | Year | Title | Author | Location |
| 1st CANDU Maintenance Conference | 1987 | The Historical Background to the Maintenance Principles and Philosophies Now Used in Ontario Hydro | L.G. McConnell (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Issues and Improvement of Today's Maintenance | C. Baird (NBEPC)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Anticipating Maintenance Needs of Ontario Hydro's Nuclear Power Plants | R.W. Bartholomew (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | The Role of Engineering and Design in Future Maintenance | D.S. Lawson (AECL)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Calandria Tube Replacement in CANDU Reactors | "D. Brown (AECL), H. Cassis, B. Dicks (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Pickering NGS B Calandria Inlet Line Failures and Repairs | "A.R. Lees, R.J. Powell (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Rolled Joint Separation by Shock Heating | "M.B. Cenanovic, M.K.C. Ng, T.A. Malkiewicz, J.T. Lee (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Replacement of Bearing Journals on Heat Transport Pumps at the Wolsung Nuclear Generating Station | "W.E. Ricketts, A.N. Kumar (AECL), O.C. Kwon (KEPCO)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Bruce GS A Calandria Tube Removal Tooling and Bulkhead Welding Tool | J.T. Wisniewski (GEC)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Positioning of Fuel Channels at Bruce NGS A | P.J. Weekes (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Employing an External Contractor for a Large Reactor Task | T.A. Meyer (Rochester Gas and Electric Corp)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Computerized Maintenance Management System | L. Rivard (HQ)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Structure and Management of LSFCRP Organization During Fuel Channel Installation | R.J. Jessop (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Program Management for Spring Location and Repositioning (SLAR) Operations at Pickering NGS | "C. Angus, P. Spooner (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Maintenance on an Off-Shore CANDU 600 | E.H. Rummel (AECL)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Maintenance Forecasting Model (MFM) - A Rigorous Approach to Assessing Plant Needs | "P.F. Tremblay, M.V. Tulett (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Maintenance Quality Assurance | I. Walker (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Maintenance Strategies for Incoloy-800 Heat Exchangers Cooled by Service Water | "W.G. Babe, H.H. Paetzold (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | "Analysis of Production Losses During a Major Outage, Pickering GS Units 1/2 Retube" | P. Pearson (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | The Maintenance Function at the Bruce Heavy Water Plant (BHWP) of Ontario Hydro | V.O.S. Thompson (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Lessons Learned in Providing Long-Term Field Support for Special Purpose Instrumentation: The Barringer Deuterium Analyzer Experience | "R.T. Faught (AECL), C. Cumming (Barringer Research Limited)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | CANDU Reactor Channel Temperature Measurement Problems and Solutions at the Pickering NGS | S.E. Harding (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Mandatory Testing of Safety Systems at an Operating CANDU Plant | "T.E. Schaubel (AECL), A.T. McGregor, D.A. Loughead (NBEPC)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Nuclear Plant Life Assurance (NPLA) Program for Ontario Hydro's NGS | "J.A. Chadha, I.N. Daly, B.D. MacTavish (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Strategy for Success in Maintenance Management at Point Lepreau NGS | R.M. White (NBEPC)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | The Predictive Maintenance Program on Rotating Equipment at the Bruce Heavy Water Plant | "V.O.S. Thompson, W.P. Mercer, G.W. MacKimmie (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | In-House Manufacturing of Spare and Replacement Parts - The Future Challenge | K. Mika (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Limitorque Operators - An Exercise in Optimized Reliability | D. Bharatwal (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Automated vs Mechanized Welding Tooling | B. Levan (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Vibration Monitoring of Heat Transfer Equipment and Piping Systems in Operating CANDU Stations | "H.L. Anderson, J.W. Forest (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Snubbers: Operating Problems Present Day Solutions | "P.H. Stubley, H. Schwarzkopf (AECL)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Proposed Baseline for Large Scale Fuel Channel Replacement of Pickering GS Units 3/4 | P. Pearson (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Fuel Channel Maintenance Future Directions | K.C. Dalton (AECL)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Maintainability of CANDU 300 | J.R. Candlish (AECL)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Overview of Pickering NGS Units 1 and 2 Retube Outage | "K.H. Talbot, B.J. Murdoch (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Pickering NGS Equipment Condition After Twelve Years of Operation | T.O. Kapaklili (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Equipment Preservation for a Four Year Outage of Pickering NGS Units 1 and 2 | "K.H. Talbot, J.T. Wieckowski (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Pickering Units 1 and 2 Restart Process (How Do You Commission an Old Unit Using New Tricks) | "D.G. Austin, K.H. Talbot (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | The Application of Hydraulic Stud Tensioning Equipment at Pickering NGS | "J.C. Dunlop (AECL), P.F. Tremblay (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Major Turbine Generator Shaft Realignment | "K.R. Howard, T.A. Henderson (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | The Impact of Long-Lived Particulates on the Pickering NGS Retubing Program | E.S. Koehl (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Contamination Control During Pickering Units 1 and 2 LSFCRP | "T.A. Bobbins, T.A. Dereski (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | In-Vault Shielding Equipment - Pickering 1 and 2 Retubing | W.J. Bethune (GEC)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Development of a Gamma Spectrometry System for In-Situ Measurement of Radioactivity Within Piping | A. Husain (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Dose Reduction in Fuelling Machine Maintenance Following Chemical Decontamination | R.W. Pockett (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Radiation Field Control in Ontario Hydro Reactors | "P.H. Skelton, C.S. Lacy, J.W. Eatock (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Waterlancing for CANDU SG's - An Update | W.G. Schneider (BWC)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Tooling to Obtain Samples of Pressure Tube Material in Reactor for Deuterium Analysis | "W.E. Muth, C.A. Cox, R. Joynes (AECL)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Examination of Core Components Removed from CANDU Reactors | "B.A. Cheadle, C.E. Coleman, D.K. Rodgers, M. Griffiths (AECL)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | The SLAR (Spacer Location and Repositioning) Tool | J.R. Hopkins (AECL)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Flow and Vibration Analysis to Upgrade a CANDU Heat Exchanger | "V.C. Frisina, L.N. Carlucci, M.J. Pettigrew (AECL), R.M. Crawford (NBEPC)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Leak Locating in Bruce NGS-A Steam Generators Using Gas Tracer Techniques | "J.H. Vandergeest, L.J. Recoskie, J.A. Aikin (AECL)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Operations Planning for Axial Repositioning of Fuel Channel Assemblies in Bruce NGS A | R.C. Day (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | In-Service Testing of Containment Structure and Vacuum Building Inspection/Test | G. Armstrong (OH)
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Ontario Hydro Nuclear Generation Division - Information Systems at Darlington NGS | "P. Norman, W.B. Edey, D.F. Meraw (OH)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Tooling Development - The Long Term Approach | "J.M. Brown, D.J. Pink (BWC)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | Ongoing Maintenance of CANDU Control Computers | "R.D. Walsh (OH), R.D. Banting (AECL)"
| Toronto |
| 1st CANDU Maintenance Conference | 1987 | The Impact of Environmental Qualification of Safety Related Equipment on Future Maintenance Activities at Darlington NGS | J.G. Ballard (OH)
| Toronto |